IHHL:
Individual House Hold Latrine Project implimented By Rwss Department . The Pri Minister of India Announced to complete the "SWACHH BHARAT ABHIYAN" before 2020. In this Abhiyan, The full country will be get cleaned and revolution will occurs to set up all minds towards the national goal to archive cleanness. Construction of Individual Toilet is a part of this mission. The Project consist a budget of Rs. 12,000 for each. This amount is given to each poor family who completed its toilet as per the estimation or more than estimation.Image Credit FreeIndiaTips |
Requirements: Materials & Labour cost
Materials Quantity Price Per Unit Total Cost
(1) Bricks 650pcs 3.6 = 2340.00
(2) Sand 1trip 400.00 = 400.00
(3) Tin (roof) 1pc 450.00 = 450.00
(4) Tin (Door) 1pc 500.00 = 500.00
(5) Cement 4pc 300.00 = 1200.00
(6) Nanda 3pc 350.00 = 1050.00
(7) Pan 1pc 300.00 = 300.00
(8) Pipe 9ft 20.00 = 180.00
(9) Pipe (Clamp) 1pc 15.00 = 15.00
(10) Pipe (Cover) 1pc 20.00 = 20.00
(11) "T" Pipe 1pc 65.00 = 65.00
(12) Mistri 4days 300.00 = 1200.00
(13) Labour 10days 120.00 = 1200.00
Total Cost: = 8920.00
*Additional Cost - 1000.00
Image credit : FreeIndiaTips |
Duration Of Complition:
One toilet may take 4 days to complete it.* The duration of completion is 15 days officially, so it is much more time. Any exceptions may takes much more.
Labour:
One mistri with two labour work for four days. Another day with only two labour to complete Sump Tank. In order to complete 10 latrine, we must have 3 mistri and 8 labour. 6 labour to cooperate 3 mistri and another 2 for Sump Tank. All 10 lartine may completed with in 15days.
Estimated Profit:
One toilet cost: 9920.0010 toilet cost: 99200.00
Bill Amount For 1 Latrine: 12000.000
Bill Amount For 10 Latrine: 120000.00
Net Profit = 10 Bill Amounts - 10 Latrine cost
= 1,20,000.00 - 99,200.00
= 20,800.00
All people should be in contact
2. Block Level Rwss Office
3. Labours
4. Co- workers
5. Materials Supliers
Document to collect:
Collect voter id card along with BPL/APL/Antodaya card xerox copy. Signature of beneficiary in two form. The required form may be obtained from Block level Rwss office.
Terms & Conditions:
The above estimated profit is for educational purpose only. Free India Tips always wants to maximizing employment & settle all necessary projects. As it is not possible for a rural poor family to construct his latrine by IHHL Scheme. The unemployed youth can take leadership and get profit from this project. If you arenot satisfy with our policy then contact us for necessary step.
The mentioned is based on Odisha location estimation.Try on your own risk as an intelligent person. Students are more welcome to future India
I am working om this project on Daspalla, Nayagarh, Odisha. I have followed your all step but i got my return after 5 months with no profit. The officers in rwss, daspalla are corrupted, they take 800 for each latrine as their PCs. But cheat me with unnecessary cause. No development and dream of truth in india till those corrupted people in rule.
ReplyDelete